Permitting.
-
Pool Layout
-
Dig/Excavation
-
Steel phase
-
Preplumbing.
-
Steel inspection
-
Plumbing inspection
-
Shell (shoot phase)
-
Pregrade.
-
Plumbing
-
Plumbing inspection
-
Deck is formed.
-
Either Waterline tile or Brick coping installed
-
Electrical phase.
-
Electric Inspection.
-
Deck is poured.
-
Topping on or Pavers Installed
-
Screen
-
Pool is prepped for interior finish
-
Interior Finished is installed.
-
Exposed aggregate or marcite is washed.
-
Pool is filled--24 to 48 hours. (do not turn water off)
-
Pool is fired-up and pool and deck are cleaned
-
Yard clean up.
-
Pool Operation Instructions.
-
Deck Sealing or final acrylic coat applied. (can be rain delayed)
-
Pool and spa are ready to use
This is a General Schedule of Construction & may vary depending upon the complexity of your particular job.